Smith and Williamson Property Survey 2012
The Smith & Williamson Property Survey 2012 is made available on Designing Buildings Wiki with the kind permission of Smith & Williamson. Some brief headlines from the survey are presented here, and the survey can be read in full by clicking on the link below.
File:Property survey 12 SV.pdf
The Smith and Williamson Property Survey 2012 (published at the end of October 2012) found a great deal of caution about the prospects for the future of the property industry, stating that ‘years of excess is taking years to unwind’.
The survey found considerable pessimism about the speed of recovery that could be expected. 46% of the 187 respondents felt the property industry would take four years or more to recover to pre-recession levels of profitability. 6% thought that it would never recover to pre-recession levels.
The survey found a very stark regional imbalance, with property in London continuing to 'defy gravity', whilst much of the rest of the UK suffered. Respondents were most pessimistic about the North East.
Whilst there was some optimism about the residential and agricultural sectors, there was a great deal of pessimism about retail, where there continues to be an over-supply of shops.
The key issues facing the property industry in the next 12 months were thought to be UK economic performance and the availability of bank finance, with banks still unwilling to lend.
The initiatives respondents felt would best assist the UK property industry were:
- Enhancing bank lending.
- Simplifying planning regulations.
- Using public funds to finance infrastructure.
- Cuts to property taxes and rates.
Related articles
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.
























